Linear Motion Shale Shaker In Drilling Rig
Oilfield Mud Cleaner
Drilling Fluid Decanter Centrifuge
Drilling Mud Desander
Hydrocyclone Desilter
Centrifugal Pump/Centrifugal Mud Pump
Shear Pump
Jet Mud Mixer
Horizontal Mud Agitator
Constant Pressure Drilling Fluid Mud Gas Separator
Mud Gun
Mud Tank
Solids Control System Vacuum Degasser
Flare Ignition Device
Diesel Tank
Submersible Slurry Pump How to install a maintenance Mud Agitators? The Mud Agitator Supplier will tell you
1. When installing the slurry agitator, horizontally lift the agitator and place it in the position to be installed smoothly. After adjusting the coaxiality <0.39mm, weld the four M16 holes to the tank and tighten the base fixing bolts. .
2. The rigid coupling of the mud agitator must be equipped with a spring pad and should be firm and reliable, otherwise it will cause the yaw of the pulsator shaft and aggravate the wear of the reducer.
3. The mud stirrer stirrer should have no abnormal noise, such as abnormal noise, high temperature and high temperature. Otherwise, stop the inspection and troubleshoot.
4. The height of the oil level of the mud agitator reducer should be kept at the middle position of the oil window, and the lubricating oil is often replenished during work. It is recommended to use 120# industrial gear oil. Other lubricants of appropriate particle size may also be used when the site is not satisfactory.